11 December – Forming of concrete base slabs for pits

Concrete base slab being poured over steel reinforcement, and the finished slab

December was a busy month with the main sections of reinforcement to the slab being formed, and then covered with 180 cubic metres of concrete for each chamber. This is then finished off with the creation of the pit upstands in reinforced concrete.

CONTACT

Energy House 2.0
Frederick Road Campus
University of Salford
Salford
M6 6PU

t. +44 (0)161 295 0073
e. energyhouse2@salford.ac.uk

CONTACT US

HOW TO FIND US

CAMPUS MAP

Energy House 2.0

https://www.youtube.com/watch?v=oP3bsXeQKYU

© 2023 University of Salford.